Disaster Recovery for Manufacturing in Ontario: Getting the Plant Back After an Outage or Attack

Restoring a plant isn’t the same as restoring an office. The ERP, the file server and the machine programs all have to come back, in the right order, and the floor has to keep shipping while they do.

Plant manager in a hard hat holding a tablet on a manufacturing floor

QUICK ANSWER

Quick answer

Disaster recovery for a manufacturer covers office systems and the plant floor: keep offline copies of ERP data and machine programs, restore in the order that gets product shipping, write manual-mode procedures, list OEM and integrator contacts, and test around planned shutdowns.

KEY TAKEAWAYS

What to remember

  • A plant's recovery plan must cover machine programs, HMI PCs and floor stations, not just servers.
  • The Cyber Centre names manufacturing among sectors hit by ransomware groups such as Akira, ALPHV and Play.
  • Norsk Hydro kept producing in 2019 by switching to manual operations, then rebuilt from backups; it estimated the cost at about NOK 800 million.
  • Restore in the order that gets product shipping: foundations, then ERP and shipping stations, then each line.
  • Windows 10 support ended October 14, 2025 and Windows Server 2016 ends January 12, 2027: keep disk images of old floor PCs.
  • Test restores on a schedule, practise manual mode on one line, and run fuller tests during planned shutdowns.
In this article
  1. What Does Disaster Recovery Mean for a Manufacturer?
  2. How Is Plant Recovery Different From Office Recovery?
  3. Why Do Manufacturers Get Hit by Ransomware?
  4. What Should a Manufacturing Disaster Recovery Plan Include?
  5. What Does a Plant Restore Order Look Like?
  6. What About Old Servers and Windows 10 PCs on the Floor?
  7. How Should a Plant Test Its Recovery Plan Without Stopping Production?
  8. How Does ACT360 Approach Disaster Recovery for Manufacturers?
  9. Final Thought

Restoring a plant isn't the same as restoring an office. The ERP, the file server and the machine programs all have to come back, in the right order, and the floor has to keep shipping while they do.

TL;DR A plant’s recovery plan has to cover two worlds: office IT (ERP, files, email) and the floor (machine programs, HMI PCs, label and scanning stations). Keep current, offline copies of both, decide the restore order by what stops shipments, write down how each line runs in manual mode, list your OEM and integrator contacts, and test it around planned shutdowns. Old servers and Windows 10 PCs make all of this harder.

Most disaster recovery advice assumes every system is a server or a cloud app. In a plant, some of the most important data isn’t on a server at all: it’s the program loaded in a machine controller, the recipe on an HMI PC, or the label template on a station by the shipping door. Lose those and production stops, even if the ERP restores perfectly. This article sits alongside our page on business continuity and disaster recovery services and our manufacturing IT page.

I’m Adam Bowles, Partner and CEO at ACT360. Below: what disaster recovery means in a plant, how it differs from an office, why manufacturers get hit, what the plan needs, an example restore order, the old-hardware problem, and how to test without stopping production.

What Does Disaster Recovery Mean for a Manufacturer?

For a manufacturer, disaster recovery is the plan for restoring the systems production depends on after a failure, fire, flood or cyber attack: the business systems in the office and the computers, programs and settings that run the plant floor.

Manufacturing is a major employer in this province: Statistics Canada reported that Ontario manufacturing employed 656,700 people in December 2025. In a 40-person fabricator or food plant without dedicated IT staff, it’s easy for a recovery plan, if there is one, to cover the server and stop there.

Disaster recovery is one half of the picture. The other half is business continuity: how the plant keeps shipping while systems are down. Our explainer on business continuity vs disaster recovery covers how the two plans fit together, and our business continuity plan template gives you the continuity side in fill-in form.

How Is Plant Recovery Different From Office Recovery?

Office recovery is mostly about servers and data. Plant recovery adds machine programs, HMI and SCADA computers, floor stations and outside parties like OEMs and integrators, and production can’t wait for all of it to finish.

System Where it lives What to keep a copy of Who usually restores it
ERP and accounting Server on site or vendor cloud Database backups, plus the application install and licence details IT provider with the ERP vendor
File server (drawings, quotes, procedures) Server on site or Microsoft 365 Regular backups with version history and an offline copy IT provider
Machine controller (PLC) programs In the controller Current program files and the version history, stored off the plant network Maintenance team, OEM or integrator
HMI and SCADA PCs PCs on the floor Project files, settings and a disk image of the PC Integrator, with IT for the PC itself
CNC and robot programs Machine memory or a program server Program library with the approved versions marked Programmers or maintenance
Label printing and scanning stations Local PCs, sometimes tied to the ERP Label templates, printer settings, station configuration IT provider
Email and Teams Microsoft 365 A separate Microsoft 365 backup IT provider

Three differences matter most in practice:

  • Some data lives outside IT’s backups. A controller program changed on the floor last month may exist only in the controller. If nobody saved a copy, a failed controller means rebuilding the program from memory or old files.
  • Outside parties hold keys. Machine builders and integrators often have the original project files, licences or remote access. Their phone numbers belong in the plan, along with what they have and how long they’d take to respond.
  • Old operating systems turn up on the floor. HMI PCs that run fine on unsupported Windows are hard to rebuild onto new hardware in a hurry. A disk image taken while they work is far quicker than a fresh install during an outage.

Why Do Manufacturers Get Hit by Ransomware?

Usually because they’re reachable, not because they were singled out. The Canadian Centre for Cyber Security says ransomware actors are opportunistic, and names manufacturing among the sectors hit by groups such as Akira, ALPHV and Play.

The Cyber Centre’s Ransomware Threat Outlook 2025-2027 says Akira has been used against manufacturing and telecommunications organizations globally and in Canada. Its National Cyber Threat Assessment 2025-2026 also notes that ransomware actors are almost certainly opportunistic and don’t target specific industries. A stopped plant also loses money by the hour, which is exactly the pressure a ransom demand relies on.

The best-documented case is Norsk Hydro, the Norwegian aluminium producer attacked in March 2019. Hydro isolated its plants and switched to manual operations and procedures, kept much of its primary metal production running with a higher degree of manual operation, and rebuilt encrypted PCs and servers from backups. It later estimated the total cost at around NOK 800 million. Two lessons carry over to a 50-person Ontario plant: the manual procedures kept product moving, and the backups made recovery possible at all.

Our article on why ransomware targets manufacturers in Canada covers the attack side in more depth, and our page on cybersecurity for manufacturing in Ontario covers the common ways into a plant and what closes each one.

What Should a Manufacturing Disaster Recovery Plan Include?

A plant’s recovery plan needs an inventory that includes floor systems, a restore order based on what stops shipments, recovery targets, backups of machine programs as well as servers, an offline copy, manual-mode procedures, outside contacts and a way to confirm restored systems are clean.

  1. An inventory that includes the floor. Every server, application and floor PC, plus each controller, HMI and station, with who owns it and who can restore it.
  2. A restore order based on shipments. Rank systems by how quickly their loss stops product leaving the building, not by which server is biggest.
  3. Recovery targets per system. How fast each must be back (RTO) and how much data or program history it can lose (RPO).
  4. Backups that include machine programs. Current copies of controller, HMI, CNC and label files, with the approved version marked, stored where ransomware on the office network can’t reach them.
  5. At least one offline copy. The Cyber Centre’s ransomware playbook recommends an offline backup process, with backups disconnected from all networks.
  6. Disk images of hard-to-rebuild PCs. Especially HMI and SCADA computers on older Windows versions.
  7. Manual-mode procedures. How each line runs, and how orders, picking and shipping work, while systems are down.
  8. Outside contacts. ERP vendor, OEMs, integrators, internet provider and insurer, with account numbers and after-hours lines.
  9. A check before reconnecting. How you’ll confirm restored systems are clean before they go back on the network.

The last point is easy to skip. The joint guidance on principles of operational technology cyber security, co-sealed by the Cyber Centre, asks plant operators to think through whether backups can be trusted if an attacker has been on the network for a while, and how to validate that a critical system is safe after recovery. Restoring last night’s backup doesn’t help if the attacker was already inside last week.

What Does a Plant Restore Order Look Like?

Restore the foundations first (network, accounts, internet), then whatever gets product out the door (ERP, shipping and label stations), then each production line, then engineering files, and reporting last.

The table below is an illustrative example for a mid-sized plant, not a standard. Your own order should come from asking each department what stops shipments and how fast.

Tier Example systems Example target Why it’s in this tier
1 Network, firewall, identity (admin accounts), internet First hours Nothing else can be restored or reached without them
2 ERP, label printing and shipping stations Same day Product can’t leave without picking, labels and paperwork
3 Line-critical HMI PCs and controller programs Same day, line by line Each line restarts as its programs and screens are confirmed
4 File server, drawings and quoting Next business day Engineering and sales can work from recent copies briefly
5 Reporting, dashboards, archives Later in the week Useful, but nothing ships late without them

Notice that the ERP isn’t automatically first. If the network and admin accounts aren’t trusted yet, restoring the ERP just puts it back somewhere unsafe. And if the label stations depend on the ERP, they come back together or the shipping dock stays stuck.

What About Old Servers and Windows 10 PCs on the Floor?

They make recovery slower and riskier. Windows 10 reached end of support on October 14, 2025, and Windows Server 2016 extended support ends January 12, 2027, so floor PCs and plant servers on those versions need a recovery plan of their own.

Microsoft’s lifecycle pages confirm both dates: Windows 10 and Windows Server 2016. Some HMI and machine PCs run on versions older still, because the machine software was certified on them and nobody wants to touch a working line.

That’s a reasonable choice for production, but it changes the recovery plan. For each old PC or server, record what it runs, keep a working disk image, keep the install media and licence keys, and know whether you have spare hardware it will actually run on. Where the machine vendor supports an upgrade, plan it during a shutdown instead of during an outage.

If the ERP server is the one on borrowed time, our page on ERP support for manufacturing in Ontario covers who owns which layer, and our article on cloud migration for manufacturing covers what should move off site and what should stay.

How Should a Plant Test Its Recovery Plan Without Stopping Production?

Test in layers: restore backups to a test machine on a schedule, practise manual mode on one line during a planned slow period, and run a tabletop with the plant manager, maintenance and IT once a year.

  • Restore tests. The Cyber Centre’s ransomware playbook suggests a regular schedule to test backups, for example monthly. Include a controller program and an HMI image, not just the ERP database.
  • Manual mode. The Cyber Centre’s guidance to protect your operational technology (ITSAP.00.051) advises testing systems and processes in manual mode. Doing it on one line during a slow shift shows what the procedure forgot.
  • Tabletop. Walk through a scenario, such as ransomware on the office network at 6 a.m. on a Monday, and time each decision. Who isolates the floor network? Who calls the integrator?
  • Bigger tests around shutdowns. Summer and holiday shutdowns are the natural window for a fuller recovery test of a production system.

Our articles on disaster recovery testing and how often to test your backups cover the testing levels and cadence in more detail.

How Does ACT360 Approach Disaster Recovery for Manufacturers?

We start on the floor, not with a backup product. Through the Assess and Comprehend steps of our ACTION approach, we walk the plant, inventory what runs where, and ask each shift what can’t stop and for how long. The restore order comes from those answers.

From there, our business continuity and disaster recovery service covers backup design around your critical systems, scheduled test restores, a documented recovery time for your environment, ransomware-specific planning alongside our cybersecurity work, audit-ready documentation for insurer and customer questionnaires, and quarterly recovery reviews so the plan keeps up with the plant. For machine programs and controllers, the plan names your OEMs and integrators and what each is responsible for, so nobody is guessing during an outage.

Final Thought

A plant’s recovery plan is only as good as its weakest copy. If the ERP is backed up nightly but the controller programs live only in the controllers, the plan has a hole exactly where production is most exposed. Inventory the floor, copy what matters, keep one copy offline, decide the restore order by what ships, and practise manual mode before you need it.

If you’d like a second opinion on your plant’s recovery setup, our free IT Readiness Assessment is a 30-minute review of your backups, security and recovery plans, with a short list of what to fix first. You can also call 705-739-2281 or email [email protected].

FAQ

What Plant Managers Ask About Disaster Recovery

Does a disaster recovery plan for a plant need to cover the machines, or just the servers?

Both, because production can stop on a lost controller program or a dead HMI PC even if every server restores perfectly. Include machine programs, HMI and SCADA computers, and label and scanning stations in the inventory, backups and restore order, with the OEM or integrator named for each.

Our ERP is in the cloud. Are we covered?

Partly: a hosted ERP takes the server off your list, but not the rest of the recovery work. You still need your own copy of your data (check what the vendor’s contract actually promises), a working internet connection, and the label and shipping stations that talk to it.

How often should controller and HMI programs be backed up?

Whenever they change, plus a scheduled check that the stored copy still matches what’s running. Programs can be edited on the floor during troubleshooting, so a copy from last year may not match the machine today. Mark which version is approved, store copies off the plant network, and include at least one in your regular restore tests.

Can a plant keep running during a ransomware attack?

Sometimes, if the floor is separated from the office network and manual procedures are written and practised. When Norsk Hydro was hit in 2019, it isolated its plants and kept much of its primary metal production running with more manual operation.

That only works if the people on shift know the manual procedure before the attack, not after.

What's a realistic recovery time for a small manufacturer?

There’s no standard number; it depends on how quickly each system’s loss stops shipments and what your backups can actually deliver.

Set targets per system with the plant manager, then time a real restore. If the tested time is longer than the target, either the backup setup or the manual workaround has to change.

Who should own the recovery plan in a plant without an IT department?

The plant or operations manager should own it, with the IT provider responsible for office systems and backups, and maintenance, OEMs or integrators responsible for machine programs. The plan should name each one, so nobody assumes someone else has the controller files.

Where do we start if our plant has never had a recovery plan?

With a one-page inventory of what runs where and who can restore it, then a single test restore of your most important system. That shows the biggest gap quickly.

ACT360’s free 30-minute IT Readiness Assessment reviews your backups, security and recovery plans and gives you a short, ordered list of what to fix first.

KEEP READING

Related Posts

Read Business Continuity Plan Template for Ontario Businesses: What to Fill In, Section by Section Business owner filling in a printed business continuity plan on a clipboard at the office

Business Continuity Plan Template for Ontario Businesses: What to Fill In, Section by Section

A business continuity plan doesn't need to be 60 pages. Here's a practical template for Ontario businesses, with the fields to fill in, worked examples and the local risks worth planning for.